Part 2: DECT Hardware Installation and Programming
31
Installation
First determine where to install the RFP to have the correct coverage. The average
coverage within buildings is 75 metres. Coverage depends on the construction of the
building, the architecture and choice of buildings materials. You must use the DECT
Demonstration and Installation Kit to optimize your installation. This deployment tool
consists of an RFP which has no need for a CCFP. It can easily be moved around in
the building and one to eight handsets can be connected.
1.
Pull the a/b wire from your installation through the wall holder and then mount
the wall holder on the wall.
2.
Connect the a/b wire to the plug on the back of the RFP. Use pins 3 and 4 on
the RJ-11 connector.
3.
Ensure the RFP is the right way up and “click” it onto the wall holder.
If you need to remove the base station, separate it from the wall holder with a gentle
push of a screwdriver.
Summary of Contents for DECT 500
Page 1: ...SAMSUNG DECT 500 1500 Product Name Installation and Programming Product Name Manual ...
Page 15: ...Part 1 Site Survey and Overview of DECT Systems 10 Survey Map of the 2nd Floor ...
Page 16: ...Part 1 Site Survey and Overview of DECT Systems 11 Survey Map of the 3rd Floor ...
Page 46: ...41 Appendix 1 Deployment Flowchart ...
Page 48: ...Samsung Telecoms U K Limited Brookside Business Park Greengate Middleton Manchester M24 1GS ...