Part 2: DECT Hardware Installation and Programming
28
6. Replace the top cover.
7. Connect the RFPs or the PBX extension lines to the DP 25 connectors.
8. Power up the CCFP.
If the RFPs are installed, make a cable measurement.
Cable Connections
RFPs (Base Stations)
D-Sub Pin
No.
Cable Colour
Base
Conn 0
Base
Conn 1
1 WHITE/BLUE
0A
8A
14 BLUE/WHITE
0B
8B
2 WHITE/ORANGE
1A
9A
15 ORANGE/WHITE
1B
9B
3 WHITE/GREEN
2A
10A
16 GREEN/WHITE
2B
10B
4 WHITE/BROWN
3A
11A
17 BROWN/WHITE
3B
11B
5 WHITE/SLATE
4A
12A
18 SLATE/WHITE
4B
12B
6 RED/BLUE
5A
13A
19 BLUE/RED
5B
13B
7 RED/ORANGE
6A
14A
20 ORANGE/RED
6B
14B
8 RED/GREEN
7A
15A
21 GREEN/RED
7B
15B
9 RED/BROWN
NC
NC
22 BROWN/RED
NC
NC
10 RED/SLATE
NC
NC
23 SLATE/RED
NC
NC
11 BLACK/BLUE
NC
NC
24 BLUE/BLACK
NC
NC
12 BLACK/ORANGE
NC
NC
25 ORANGE/BLACK
NC
NC
Summary of Contents for DECT 500
Page 1: ...SAMSUNG DECT 500 1500 Product Name Installation and Programming Product Name Manual ...
Page 15: ...Part 1 Site Survey and Overview of DECT Systems 10 Survey Map of the 2nd Floor ...
Page 16: ...Part 1 Site Survey and Overview of DECT Systems 11 Survey Map of the 3rd Floor ...
Page 46: ...41 Appendix 1 Deployment Flowchart ...
Page 48: ...Samsung Telecoms U K Limited Brookside Business Park Greengate Middleton Manchester M24 1GS ...