Part 2: DECT Hardware Installation & Programming
32
Starting the DECT 1500 System
1. Install the CCFP administration software on an IBM-compatible PC.
2. Make sure that all RFPs are connected correctly. Also, make sure that all IWU
connections are made to PABX lines.
3. Connect a serial cable (RS-232) between the CCFP and the PC installed with
the administration software.
4. Connect the power cable to the CCFP. Ensure that there is an earth connec-
tion in the power supply plug.
5. Power up the CCFP.
6. Use the administration program to:
•
Configure the system.
•
Make a cable measurement to all installed RFPs.
•
Adjust IWU parameters as required.
•
Register each handset to the system.
Summary of Contents for DECT 500
Page 1: ...SAMSUNG DECT 500 1500 Product Name Installation and Programming Product Name Manual ...
Page 15: ...Part 1 Site Survey and Overview of DECT Systems 10 Survey Map of the 2nd Floor ...
Page 16: ...Part 1 Site Survey and Overview of DECT Systems 11 Survey Map of the 3rd Floor ...
Page 46: ...41 Appendix 1 Deployment Flowchart ...
Page 48: ...Samsung Telecoms U K Limited Brookside Business Park Greengate Middleton Manchester M24 1GS ...