Site preparation
98-137654-A
Chapter 3: Installation
3-3
3333
In
stall
ati
o
n
• PC and Internet browser
• Drill for the mounting holes for the ACU
• Crimping tools
3.2
Site preparation
The following topics have to be considered when installing the ADU:
•
•
•
Blocking zones — azimuth and elevation
•
Ship motion and offset from the ship’s motion centre
•
ADU mast design: Foundation and height
•
•
3.2.1 General site considerations
For optimum system performance, some guidelines on where to
install or mount the different components of the SAILOR 100 Satellite
TV System must be followed.
It is recommended to mount the ADU in a location with as much
360° free line of sight to the satellite
as possible while making sure
that the support structure fulfills the requirements for the mast
foundation. The ADU must be mounted on stiffened structures with
a minimum of exposure to vibrations.
SAILOR100TM.book Page 3 Tuesday, January 29, 2013 2:44 PM
Summary of Contents for 100
Page 1: ...TRAINING INSTALLATION SERVICE MANUAL SAILOR 100 Satellite TV ...
Page 2: ......
Page 13: ...Table of contents 98 137654 A xi SAILOR100TM book Page xi Tuesday January 29 2013 2 44 PM ...
Page 14: ...Table of contents xii 98 137654 A SAILOR100TM book Page xii Tuesday January 29 2013 2 44 PM ...
Page 215: ...Appendices SAILOR100TM book Page 1 Tuesday January 29 2013 2 44 PM ...
Page 216: ...SAILOR100TM book Page 2 Tuesday January 29 2013 2 44 PM ...
Page 254: ...Glossary Glossary 4 98 137654 A SAILOR100TM book Page 4 Tuesday January 29 2013 2 44 PM ...
Page 261: ......