D
omestic
I
nstallation
I
nstructions
A
Scale Manager 2
kit comprises of the following:
One computerised electronic water descaler
One 12 volt power supply, cable length 1.8m
– 6'
Optional when ordering, 5m - 16½'
power supply extension lead
Antenna cable with
red
plug
Antenna cable with black plug
Five plastic cable ties (1 spare)
One attachable Black antenna plug
One attachable Red antenna plug
Please Note: -
Ensure antennae cables do not come into contact with each other
The gap between the coils must be in excess of 60mm - 2½" no upper limit
Coils require a minimum of 50mm - 2" each side of uninterrupted straight pipe
Direction of coils are essential - see over
Ideally a 125mm
+ (5"+) straight run of pipe is required for each antenna coil
Direction of Water Flow is immaterial
Connect red plugs to red sockets and black to black
Scale Manager is effective on all pipes (copper, plastic, lead, steel etc)
Performance is not impaired if the pipe is painted
The Control Unit can be fitted at any angle or plane
A 13-amp socket is required for the power supply
The ideal location to install Scale Manager is near the entry point of the rising main, before any
junctions. The antennae coils operate independently and can be positioned on separate pipes should
you not have an uninterrupted pipe run of 250mm - 10". Should the inlet pipe T off within 125mm
– 10"
of the stopcock, position the coils as fig 1 overleaf. If the inlet pipe available is over 125mm - 5" but
under 250mm - 10" position as fig 2 overleaf.
The antennae coils require a minimum gap between them of 50mm - 2". It is also necessary that
the coils are at least 40mm -1½" from elbows and junctions.
Fitting: - The diagram overleaf may be of assistance.
1
Position the Scale Manager control unit close to the water inlet pipe, allowing sufficient space
to connect the antennae and power plugs
2
Connect the RED plugged antenna to a RED socket marked
Red OUT
3
Pass the antenna cable over the front of the pipe and secure with a cable tie
4
Closely coil the wire around the pipe 12 times - see ov
er in the direction of the arrows
.
5
Tighten the coil and secure with a cable tie.
6
Leave sufficient wire to reach the remaining
Red IN
socket -
trim off the excess
. Connect the
loose RED antenna plug to the cable by pulling off the plastic insulation cover (pliers may be
needed) if not already removed - thread wire through the insulation cover - trim off 5mm -¼" of
insulation from the wire - connect to the plug via the screw terminal - replace the insulation
cover - connect to the
Red IN
socket on the control unit.
Repeat the same process with the BLACK plugged antenna starting by connecting to the
Black
IN
socket, making sure to coil in the direction of arrows
– see over.
Plug the power supply into a 13-amp socket, connect to the socket on the control unit and
switch on.
The power LED will illuminate pulsing for a few seconds whilst carrying out a self-diagnostic routine. The
R.F. & D.I.C descaling bar graph LED's will then illuminate showing de-scaling is in progress. They will
cycle at a rate of 1.26 seconds. Each LED represents 650 magnetic pulses, totalling 6,500 per second
through each of the antenna coils.