Removal and replacement of ADU modules
8-74
Chapter 8: Service & maintenance
98-137654-A
8.5.10.2 Inserting a new LNB
To insert a new LNB follow the instructions above in reverse order.
You may need to slide the drive belt on after the LNB is mounted
with its three screws.
8.5.11 Replacing the rotary joint
8.5.11.1 Removing the rotary joint
1. Open the service hatch by releasing the two latches with Torx
screws.
2. Switch off the power to the antenna on the service switch.
3. Rotate the antenna pedestal so that the Azimuth DDM faces the
service hatch.
4. Rotate the Antenna Dish to top position.
Note
When tightening the 3 screws holding the LNB it is
important that you alternate between the 3 when
tightening them.
Do not tighten one at a time!
Figure 8-96: Rotary joint
Tools needed:
• 4 x 150 mm Allen key
(located inside the
service door of the ADU)
SAILOR100TM.book Page 74 Tuesday, January 29, 2013 2:44 PM
Summary of Contents for 100
Page 1: ...TRAINING INSTALLATION SERVICE MANUAL SAILOR 100 Satellite TV ...
Page 2: ......
Page 13: ...Table of contents 98 137654 A xi SAILOR100TM book Page xi Tuesday January 29 2013 2 44 PM ...
Page 14: ...Table of contents xii 98 137654 A SAILOR100TM book Page xii Tuesday January 29 2013 2 44 PM ...
Page 215: ...Appendices SAILOR100TM book Page 1 Tuesday January 29 2013 2 44 PM ...
Page 216: ...SAILOR100TM book Page 2 Tuesday January 29 2013 2 44 PM ...
Page 254: ...Glossary Glossary 4 98 137654 A SAILOR100TM book Page 4 Tuesday January 29 2013 2 44 PM ...
Page 261: ......