244
1. HYDRAULIC INSTALLATION
1: Pump
2: Device
3: Gate valve
4: Pressure transducer
5: Non return valve
6: Pressure tank
7: Drain off valve
INFO
LEGEND
For correct operation of the pressurization system, we recommend the use small size pressure tank. It is necessary to stabilize any pressure
fluctuations during the variation frequency of the inverter.
Pay attention to the calculation for pre-charge of the pressure tank. In case of changes in the reference pressure, the pre-charge of the tank must
be adjusted according to the calculation.
Pp = Pre-charge pressure
Ps = Setpoint pressure
Dr = Delta restart pressure
Pp = (Ps – Dr) – 0,5 bar
Figure 1
Summary of Contents for emotion MT2-11A
Page 2: ......
Page 196: ...196 RU 1 2...
Page 200: ...200 RU c 5 11 3 1 4 2 2 9 11b 10 6 1 13 d 2 3 3 7 8 2 2 14 1 2...
Page 216: ...216 RU 0 5 17 F01 F02 F03 F04 F05 4 20 mA...
Page 217: ...RU 217 RU F06 F07 F08 A10 A11 A12 A15 ALARM X13 ALARM X14 NTC PTC PTC NTC A09 10 Hz 65 Hz...
Page 218: ...218 RU 18 19 20 2012 19 UE...
Page 243: ...TECHNICAL DATA...
Page 253: ......
Page 254: ...254 7 SCHEMATIC DIAGRAM TT3 30A 2 3 4 12 1 13 11b 11a 11b 7 9 15 14 8 17 5 6 16 10...
Page 257: ......
Page 260: ...260 N RU IT 49 01167 19 18 07 2019 17 07 2022 RU 31112 00011 www sacipumps com...
Page 261: ...261...
Page 262: ......