RVE MERAK E750 - ASSEMBLY INSTRUCTIONS
TAIL PITCH LEVER ASSEMBLY AND INSTALLATION (5-6)
The tail pitch lever carbon plate is fixed to the aluminium tail pitch lever with two M2.5 x 6 mm
screws as shown in the pictures.
The control ball is secured to the carbon plate with a phillips head screw with a nylon lock-nut.
Threaded guiding pins are installed in the aluminium tail pitch lever with soft threadlocker.
Glue the two flanged bearings in the aluminium tail pitch lever with medium threadlocker.
Install the tail pitch lever assembly in the tail pitch lever support with the provided aluminium
bushings, then secure it with the
M3 x 8 mm button head screws using soft threadlocker.
Slide the tail slider assembly into the tail shaft first, then slide the tail pitch lever pins into
plastic bearing ring groove.
***Recommended tightening torque:
0.6 Nm for the M3 x 8 mm button
head screws
0.8 Nm for the M2.5 x 6 mm screws
and threaded guiding pins
32
Summary of Contents for Merak E750
Page 1: ...RVE Merak E750 Assembly Instructions www rverc com V1 0 FEB 2019...
Page 43: ...RVE MERAK E750 ASSEMBLY INSTRUCTIONS ASSEMBLY DIAGRAMS 43...
Page 44: ...RVE MERAK E750 ASSEMBLY INSTRUCTIONS 44...
Page 45: ...RVE MERAK E750 ASSEMBLY INSTRUCTIONS 45...
Page 46: ...RVE MERAK E750 ASSEMBLY INSTRUCTIONS 46...
Page 47: ...RVE MERAK E750 ASSEMBLY INSTRUCTIONS 47...
Page 48: ...RVE MERAK E750 ASSEMBLY INSTRUCTIONS 48...
Page 49: ...RVE MERAK E750 ASSEMBLY INSTRUCTIONS 49...
Page 50: ...RVE MERAK E750 ASSEMBLY INSTRUCTIONS 50...
Page 51: ...RVE MERAK E750 ASSEMBLY INSTRUCTIONS 51...
Page 52: ...RVE MERAK E750 ASSEMBLY INSTRUCTIONS 52...
Page 53: ...RVE MERAK E750 ASSEMBLY INSTRUCTIONS 53...
Page 54: ...RVE MERAK E750 ASSEMBLY INSTRUCTIONS 54...