
RVE MERAK E750 - ASSEMBLY INSTRUCTIONS
TAIL ROTOR ASSEMBLY AND INSTALLATION (5-7)
Install the tail blade holders shafts into
the hub with soft threadlocker.
Use a 6 mm one-way wrench for
tightening them.
Install the M3 threaded ball in each blade holder.
Complete the assembly as shown in the picture.
The thrust bearing must be greased, then assembled
with its bigger id bearing race inside and the shorter
one outside. Fix it with the M3 x 8 mm screw using
soft threadlocker.
***Recommended tightening torque:
0.8 Nm for the M3 threaded balls
1.2 Nm for the M3 x 8 mm screws
33
Summary of Contents for Merak E750
Page 1: ...RVE Merak E750 Assembly Instructions www rverc com V1 0 FEB 2019...
Page 43: ...RVE MERAK E750 ASSEMBLY INSTRUCTIONS ASSEMBLY DIAGRAMS 43...
Page 44: ...RVE MERAK E750 ASSEMBLY INSTRUCTIONS 44...
Page 45: ...RVE MERAK E750 ASSEMBLY INSTRUCTIONS 45...
Page 46: ...RVE MERAK E750 ASSEMBLY INSTRUCTIONS 46...
Page 47: ...RVE MERAK E750 ASSEMBLY INSTRUCTIONS 47...
Page 48: ...RVE MERAK E750 ASSEMBLY INSTRUCTIONS 48...
Page 49: ...RVE MERAK E750 ASSEMBLY INSTRUCTIONS 49...
Page 50: ...RVE MERAK E750 ASSEMBLY INSTRUCTIONS 50...
Page 51: ...RVE MERAK E750 ASSEMBLY INSTRUCTIONS 51...
Page 52: ...RVE MERAK E750 ASSEMBLY INSTRUCTIONS 52...
Page 53: ...RVE MERAK E750 ASSEMBLY INSTRUCTIONS 53...
Page 54: ...RVE MERAK E750 ASSEMBLY INSTRUCTIONS 54...