19
INSTALL 3/8 NPT STRAIN
RELIEF AND ROUTE FA9190-6
OVERHEAD SWITCH CABLE
THROUGH THE STRAIN
RELIEF (ATTACHED TO THE
MOTOR CONTACTOR)
B) Install included 3/8 NPT strain relief and nut to
the back of the cabinet and route the FA9190-6
over head switch cable through the strain relief,
Figure 30. The FA9190-6 overhead switch cable
is shipped attached to the grounding bolt inside
the DC control cabinet.
Fig. 30
C) Attach battery cabinet mounting bracket to the
cabinet with (2) 5/16"-18NC x 1" lg. flange head
cap screws and nuts as shown, Figure 30a.
(2) 5/16"-18NC HEX FLGD
WZLOCK NUT
BATTERY CABINET
MOUNTING BRACKET
(2) 5/16"-18NC x 1" Lg. HEX FLGD
WZLOCK HHCS
Fig. 30a
Summary of Contents for SPO16
Page 31: ...31 Notes...