9
ARM STOP (REF FIG. 21) IS LOCATED IN THE
YOKE TUBE CLOSEST TO THE POWER UNIT.
POSITION ARM STOP AS SHOWN.
OVERHEAD HOSE ROUTING
11. Hoses:
Clean adapters and hose. Inspect all threads
for damage and hose ends to be sure they are crimped.
Adapter & Hose Installation
A)
Install item (2) with hose clamps, on power unit column
side connecting it to the cylinder (1) first.
B)
Install item (3) with hose clamps starting at left
column cylinder (5) and working toward the right column.
All excess hose should be at bends & inside overhead
assembly.
C)
Connect item (2) & item (3) to Tee (4).
IMPORTANT:
All O-ring face seal connections should be
torqued to 18-20 ft. lbs.
NOTE:
Route Power Unit hose inside columns using slots
provided at column base, Fig. 11, Fig. 12, and Fig. 13. Route
Overhead Hose in column channel on outside of column to
inside of column extensions. Attach to column extensions
with pipe clamp and route up and thru hole in each end of
the overhead.
COLUMN EXTENSION
HOSE ROUTING
HOSE CLIP
LOCATION
HOSE CLIP
LOCATION
Fig. 12
Fig. 11
Summary of Contents for SPO16
Page 31: ...31 Notes...