18
REMOVE FRONT COVER
AND THIS LOWER COVER
PUSH NUTS HOLD BOLTS
AND SPLASH SHIELD TO BRACKET
5/16"-18NC x 1" LONG BOLT
ON ONE BOLT,
PLACE (2) 5/16" STAR WASHERS
25. Power Unit:
A) First, install (1) star washer onto one of the (4)
5/16”-18NC x 1” long HHCS.
This is very important
for grounding.
B) Put the (4) 5/16”-18NC x 1” HHCS thru holes in the
power unit bracket and splash shield using push-
nuts to hold in place, Fig. 28.
C) Mount power unit with motor up to the column
bracket and install (2) 5/16” star washers and
(4) 5/16” nuts.
26. DC Control Cabinet:
A) First, remove front plastic covers and lower cover,
Fig. 29, and set aside to be reinstalled later.
Fig. 28
Fig. 29
SPO16 - SPO20 2-Post DC Installation
Recommended Battery Specifications
Normal Operation and Life High Use (15 minutes or less between lift
cyles) or increase in life under normal use
Battery Type
Standard Lead Acid
Absorbed Glass Mat (AGM) Technology
Voltage
12V
12V
Size
Group 24
Group 24
Cold Cranking Amps
525
710
Terminal Location
Top
Top
Note:
If a single battery fails during use the system should be evaluated to determine if the
second battery should be replaced at the same time to avoid down time at a later date due to
issues with the battery.
Summary of Contents for SPO16
Page 31: ...31 Notes...