![Roland VS-300 Service Notes Download Page 76](http://html.mh-extra.com/html/roland/vs-300/vs-300_service-notes_1481343076.webp)
3-3
MAIN BOARD REPLACEMENT (In case that the parameters can be transferred by Peck.) : 35 min.
1. BATTERY INSTALLATION
2. FIRMWARE INSTALLATION
3. SYSTEM PARAMETER INITIALIZE
4. IP ADDRESS SETTING
Start the machine with the Service Mode and set in the User Menu.
5. PUT PARAMETER
6. TIME AND DATE SETTING
Set the date and time in the [SERVICE MENU]>[SUB MENU]>[CLOCK]. *Set the [DATE] in order of the [Year/Month/Day].
7. SENSOR CHECK
It can be performed in the SENSOR CHECK.
8. CROP MARK SENSOR ADJUSTMENT
9. CROP-CUT ADJUSTMENT
Necessary when the voltage is adjusted in the CROP MARK SENSOR ADJUSTMENT.
Adj. Time : 35min
Total Time : 70min.
CUTTING CARRIAGE BOARD REPLACEMENT : 7min.
1. TOOL UP/DOWN CHECK
2. PINCH ROLLER SENSOR CHECK
3. CROP MARK SENSOR ADJUSTMENT
4. CROP-CUT ADJUSTMENT
Adj. Time : 23min
Total Time : 30min.
CARRIAGE BOARD REPLACEMENT : 10min.
1. HEAD UP/DOWN SENSOR CHECK
It can be performed in the SERVICE MENU>[SENSOR CHECK].
2. THERMISTER CHECK
3. LINEAR ENCODER SETUP
Adj. Time : 10min
Total Time : 20min.
PANEL BOARD REPLACEMENT : 7min.
1. LCD/LED/BUZ CHECK
It can be performed in the [SUB MENU]>[LCD/LED/BUZ CHK].
2. KEY CHECK
It can be performed in the [SUB MENU]>[KEY CHECK].
Adj. Time : 3min
Total Time : 10min.
SERVO BOARD REPLACEMENT : 18min.
1. I/S CHECK
It can be performed in the [I/S MENU]>[I/S CHECK].
2. IC CHECK
It can be performed in the [I/S MENU]>[CARTRIDGE]>[IC CHECK].
3. FAN CHECK
It can be performed in the [SUB MENU]>[FAN CHECK]>[VACUUM FAN] to check that there is a operation sound of the vacuum fans.
4. PUMP CHECK
It can be performed in the [I/S MENU]>[PUMP CHECK]>[PUMP SUCTION] to check the pumps work correctly.
5. SENSOR CHECK
It can be performed in the [SENSOR CHECK].
6. HEATER CHECK
It can be performed in the [HEATER MENU]>[HEATER CHECK].
7. GRIT ENCODER CHECK
It can be performed in the [MOTOR MENU]>[G-ENC. CHECK].
8. AGING
It can be performed in the [MOTOR MENU]>[AGING]>[BOTH].
9. TOOL UP/DOWN CHECK
It can be performed by [PAUSE] key in the [CUTTING MENU]>[FORCE ADJUST].
10. TOOL PRESSURE ADJUSTMENT
11. CROP MARK SENSOR ADJUSTMENT
11. CROP-CUT ADJUSTMENT
Adj. Time : 40min
Total Time : 58min.
PUMP REPLACEMENT : 10 min.
1. PUMP CHECK
2. PUMP TIMES CLEAR
Adj. Time : 2min
Total Time : 12min.
ENCODER SCALE REPLACEMENT : 25min.
1. LINEAR ENCODER SETUP
Adj. Time : 5min.
Total Time : 30min.
ENCODER BOARD REPLACEMENT : 15min.
1. LINEAR ENCODER SETUP
Adj. Time : 5min.
Total Time : 20min.
BATTERY REPLACEMENT : 7min.
1. TIME AND DATE SETTING
Adj. Time : 2min.
Total Time : 9min.
CUT RIBBON CABLE REPLACEMENT : 20min.
Total Time : 20min.
Summary of Contents for VS-300
Page 49: ...2 4 MAIN BOARD_Arrangement Diagram Soldering Side ...
Page 60: ...2 15 SERVO BOARD_Arrangement Diagram Soldering Side ...
Page 65: ...2 20 2 4 CARRIAGE BOARD CARRIAGE BOARD_Arrangement Diagram Component Side ...
Page 68: ...2 23 2 5 SUB BOARD SUB BOARD_Arrangement Diagram Component Side ...