3-115
13
14
Cable Clamp
Main Board
15
Ferrite Cores
16
Clamp
Move the Ink Tubes with the Tube Guides rightward and re-
move the Ribbon Cables from the Carriage Board.
Remove the Ribbon Cables from the Main Board and remove
the Cable Clamp from the Ribbon Cables.
Carriage Board
Remove the Ferrite Core from the Ribbon Cables.
Open the four Clamps shown in the figure.
Summary of Contents for VS-300
Page 49: ...2 4 MAIN BOARD_Arrangement Diagram Soldering Side ...
Page 60: ...2 15 SERVO BOARD_Arrangement Diagram Soldering Side ...
Page 65: ...2 20 2 4 CARRIAGE BOARD CARRIAGE BOARD_Arrangement Diagram Component Side ...
Page 68: ...2 23 2 5 SUB BOARD SUB BOARD_Arrangement Diagram Component Side ...