![Roland VS-300 Service Notes Download Page 166](http://html.mh-extra.com/html/roland/vs-300/vs-300_service-notes_1481343166.webp)
3-93
2
Fold the ribbon cable with 90 degree at the 18 +/-5 mm point
from the left end.
3-19 HOW TO FOLD RIBBON CABLE TO THE HEAD
There is no difference between left and right direc-
tion.
3
Fold back the ribbon cable at the 20 +/- 5mm point.
1
Place the ribbon cable whose character side faces up.
These procedures are for the ribbon cables to the Head. The ribbon
cable and the procedure are different from each connector. Refer to
the following list and procedures and fold the ribbon cables.
Connector A : 1000006702 CABLE-CARD,29P1 256L BB HIGH-V
Connector B : 1000006702 CABLE-CARD,29P1 256L BB HIGH-V
Connector C : 1000006703 CABLE-CARD,29P1 276L BBR HIGH-V
Character side
18 +/- 5mm
Character side
18 +/- 5mm
Plain side
90 degree
18 +/- 5mm
Plain side
20 +/- 5mm
18 +/- 5mm
Plain side
20 +/- 5mm
Character side
Character side
<Connector A : 1000006702 CABLE-CARD,29P1 256L BB HIGH-V>
<Connector A : 1000006702 CABLE-CARD,29P1 256L BB HIGH-V>
A
A
B
C
Summary of Contents for VS-300
Page 49: ...2 4 MAIN BOARD_Arrangement Diagram Soldering Side ...
Page 60: ...2 15 SERVO BOARD_Arrangement Diagram Soldering Side ...
Page 65: ...2 20 2 4 CARRIAGE BOARD CARRIAGE BOARD_Arrangement Diagram Component Side ...
Page 68: ...2 23 2 5 SUB BOARD SUB BOARD_Arrangement Diagram Component Side ...