4-23
1
2
Open the Front Cover.
Release the cap of the Head Carriage and disconnect
the Tool Carriage from the Head Carriage.
4-3 HEAD ALIGNMENT (Referential Time : 15 min.)
This is necessary to obtain the good printing quality. Be sure to operate this alignment when the head is replaced.
If the heads are not aligned, printing problems such as banding,
fi
ne lines and gap between bands could occur.
The PET-G is required for this alignment.
Please DO NOT use Take-Up Unit for this alignment.
Remove the Right Cover and Right Top Cover.
3
Remove the Head Carriage Cover.
Lock the Head Carriage.
1
2
Right Top Cover
Right Cover
The Head Carriage Cover has six screws.
Head Carriage Cover
Summary of Contents for VS-300
Page 49: ...2 4 MAIN BOARD_Arrangement Diagram Soldering Side ...
Page 60: ...2 15 SERVO BOARD_Arrangement Diagram Soldering Side ...
Page 65: ...2 20 2 4 CARRIAGE BOARD CARRIAGE BOARD_Arrangement Diagram Component Side ...
Page 68: ...2 23 2 5 SUB BOARD SUB BOARD_Arrangement Diagram Component Side ...