14
Value
Series
Manual
Flue
Installa on
(indoor
models
only)
Ver cal
Termina on
(condensate
collector
must
be
used
in
all
installa ons)
3
in
(75
mm)
minimum
3
in
(75
mm)
minimum
Horizontal
Termina on
using
the
Condensate
Collector
3
in
(75
mm)
minimum
Condensate
Trap
To
adjust
the
condensate
collector
posi on
or
to
replace
the
female
vent
top
with
a
male
vent
top:
1.
Loosen
the
4
screws
at
the
rear
bracket
2.
Slide
the
bracket
away
from
the
female
vent
top.
3.
Remove
the
4
screws
a aching
the
female
vent
top
to
the
water
heater.
4.
Li
up
the
female
vent
top
and
reposi on
as
desired
(or
replace
with
a
male
vent
top).
5.
Install
the
4
screws
at
the
vent
top
and
ghten
the
4
screws
at
the
bracket.
Secure
the
fi
rst
vent
component
to
the
water
heater
with
one
self
‐
tapping
screw
at
the
hole
located
above
the
condensate
collector.
Bracket
Condensate
Collector
Securing
Screw
Horizontal
Termina on
without
using
the
Condensate
Collector
Maximum
Height
*
5
feet
(1.52
m)
Regions
of
cold
climate
will
create
more
condensate
in
the
vent
system.
The
condensate
collector
should
be
used
in
cold
climates.
If
more
than
one
elbow
is
used
in
the
ver cal
sec on
the
condensate
collector
must
be
used.
*
The
condensate
collector
must
be
used
in
horizontal
termina ons
if
a
ver cal
rise
in
the
vent
system
exceeds
5 .
If
the
condensate
collector
is
not
used,
the
drain
pipe
must
be
capped
to
prevent
exhaust
gases
and
condensate
from
entering
the
building.
The
cap
is
supplied
on
the
appliance.
WARNING
Install
the
ven ng
termina on
according
to
the
diagrams
and
instruc ons
below.
Summary of Contents for . REU-VC2025FFU-US
Page 27: ...Value Series Manual 27 Ladder Diagram ...
Page 77: ...Value Series Manual 77 ...
Page 78: ...78 Value Series Manual ...
Page 79: ...Value Series Manual 79 ...