Value
Series
Manual
17
Piping
Diagram
for
Basic
Installa on
Gas Supply
3/4" Cold Water Supply Line
3/4" Hot Water Supply Line
Rinnai
Water Heater
Rinnai
Equipment List
Rinnai
Water Heaters
RIK-KIT (Optional)
(3/4" Fittings Include:
2 Unions, 2 Ball Valves,
2 Drain Valves and
1 Pressure Relief Valve.)
QTY
1
1
3/4" Gas Connection
For Building Fixtures
Pressure Relief Valve
3/4" Ball Valve
3/4" Union
Check Valve
S
Pressure Regulator
Circulating Pump
Solenoid Valve
Boiler Drain Valve
KEY
This is not an engineered drawing. It is intended only as a guide and not
as a replacement for professionally engineered project drawings. This
drawing is not intended to describe a complete system. It is up to the
contractor/engineer to determine the necessary components and
configuration of the particular system being installed. This drawing does
not imply compliance with local building code requirements. It is the
responsibility of the contractor/engineer to ensure installation is in
accordance with all local building codes. Confer with local building
officials before installation.
Summary of Contents for . REU-VC2025FFU-US
Page 27: ...Value Series Manual 27 Ladder Diagram ...
Page 77: ...Value Series Manual 77 ...
Page 78: ...78 Value Series Manual ...
Page 79: ...Value Series Manual 79 ...