
22
Value
Series
Manual
Moun ng
the
controller
1.
Make
three
holes
in
the
wall
as
shown.
2.
Run
the
cable
between
the
controller
and
the
water
heater
or
the
controller
and
another
controller.
3.
Remove
the
face
plate
from
the
temperature
controller
using
a
screwdriver.
4.
Connect
the
cable
to
the
temperature
controller.
5.
Mount
the
controller
to
the
wall
using
the
holes
drilled
in
step
1.
6.
Disconnect
the
power
from
the
water
heater.
7.
Remove
the
plas c
cover
from
the
PCB
and
electrical
connec ons.
8.
Thread
the
cable
through
the
access
hole
at
the
base
of
the
unit
and
connect
the
wires
to
the
controller
terminals
on
the
right
hand
side
bo om
of
the
PCB.
9.
Secure
the
controller
cable
using
the
clamp
provided.
10.
Replace
plas c
cover
over
PCB
and
then
replace
the
cover
of
the
water
heater.
Outline of Remote
securing screw
1-21/32"
3-5/16"
securing screw
wiring hole
Summary of Contents for . REU-VC2025FFU-US
Page 27: ...Value Series Manual 27 Ladder Diagram ...
Page 77: ...Value Series Manual 77 ...
Page 78: ...78 Value Series Manual ...
Page 79: ...Value Series Manual 79 ...