52
www.rinnai.it
MAIN COMPONENTS DISASSEMBLY
ELECTRICAL TRANSFORMER
1 -
Unplug the boiler.
2 -
Remove the front panel, the siphon and the PCB.
3 -
Disconnect the electrical wiring.
4 -
Remove the fixing screws (3x).
CIRCULATION PUMP
1 -
Unplug the boiler, close the inlet and outlet water valves and
drain the water from the CH pipes (act on the pressure relief
valve).
2 -
Remove the front panel and the siphon.
3 -
Unplug the pump wirings.
4 -
Remove the fixing screws (2x) at the bottom part of the casing.
5 -
Remove the CH pipe clips and the pump clip.
3-WAY VALVE
1 -
Unplug the boiler, close the inlet and outlet water valves and
drain the water from the CH pipes (act on the pressure relief
valve).
2 -
Disconnect the CH return connector.
3 -
Separate the CH return connector from the 3-way valve.
4 -
Remove the clip that fastens the CH pipe (O-ring P20) (2x).
5 -
Remove the fixing clip from the heat exchanger (O-ring P14).
Summary of Contents for Mirai 24
Page 1: ......
Page 2: ...2 www rinnai it ...
Page 11: ...www rinnai it 11 MAIN COMPONENTS ...
Page 12: ...12 www rinnai it MAIN COMPONENTS ...
Page 30: ...30 www rinnai it MAIN COMPONENTS ...
Page 31: ...www rinnai it 31 GENERAL SCHEME AND OPERATION PRINCIPLES ...
Page 38: ...38 www rinnai it INSTALLATION Type C room sealed forced flue application ...
Page 55: ...www rinnai it 55 WIRING DIAGRAM ...
Page 56: ...56 www rinnai it DIAGNOSIS POINT ...
Page 57: ...www rinnai it 57 TECHNICAL DATA ...
Page 59: ...www rinnai it 59 COMBUSTION PARAMETERS ...
Page 61: ...www rinnai it 61 DATA PLATE ...
Page 62: ...62 www rinnai it CE CERTIFICATE ...
Page 63: ...www rinnai it 63 ...