For example, if all of one line data are black, the first and second outputs are
as follows:
[Previous Line’s Pixel is White]
A black datum is sent to the
corresponding thermal heating element
as the first output. The applied energy to
plot the pixel increases.
[Previous Line’s Pixel is Black]
A white datum is sent as the first output.
The applied energy to plot the pixel
decreases.
The line data sent to the thermal head drive PCB are stored in a line memory
(Memory 1). When the image data of the following scanning line are sent and
stored in the line memory, the previous line data move to another memory
(Memory 2). The line data and previous line data are compared, and the
pre-heat and/or cool data for each thermal heating element are serially sent
to the thermal head as the first output. The line data to plot the master are
picked out from the line memory (Memory 1) and are sent following the first
output.
The outputs are divided into four (DATA 1 to 4) in the image pixel data
decoder and are sent separately to the four blocks of the thermal head.
1153
~
2304
2305
~
3456
3457
~
4608
1
~
1152
CN705-16
R4608
72
55
54
37
36
19
18
2
1
R 1
Memory 1
Memory 2
Image
Data
Thermal Head Drive PCB
Thermal Head
1st Out put
2nd Out put
DATA 4
DATA 3
DATA 2
DATA 1
Block 4
Block 3
Block 2
Block 1
Previous Line
Plotting Line
1st Output
2nd Output
Main Scanning Direction
Black
White
Image
Image
1 December 1993
2-137
Summary of Contents for VT3500
Page 8: ...2 6 USER CODE MODE 4 27 2 6 1 User Codes 4 27 2 6 2 How To Use a User Code 4 27...
Page 15: ...SECTION 1 OVERALL MACHINE INFORMATION...
Page 19: ...2 GUIDETOCOMPONENTSANDTHEIRFUNCTION 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1 December 1993 1 5...
Page 21: ...16 17 18 19 20 21 22 23 24 25 26 27 28 1 December 1993 1 7...
Page 37: ...SECTION 2 SECTIONAL DESCRIPTION...
Page 89: ...E H D G F D C A B C I J K 1 December 1993 2 53...
Page 123: ...1 December 1993 2 87...
Page 127: ...1 December 1993 2 91...
Page 162: ...13 14 15 16 17 18 10 11 12 1 December 1993 2 126...
Page 163: ...19 20 21 22 23 24 25 26 27 1 December 1993 2 127...
Page 164: ...28 29 30 31 32 33 34 35 36 1 December 1993 2 128...
Page 165: ...37 38 39 40 1 December 1993 2 129...
Page 192: ...SECTION 3 INSTALLATION...
Page 206: ...SECTION 4 SERVICE TABLES...
Page 209: ...Q Fig 4 R S Fig 5 T U Fig 6 V Fig 7 1 December 1993 4 3...
Page 234: ...SECTION 5 REPLACEMENT AND ADJUSTMENT...
Page 317: ...SECTION 6 TROUBLESHOOTING...