[Release Mechanism]
The release mechanism does two things: it raises and lowers the upper
second feed roller, and it activates the lower one. It also synchronizes these
two steps.
The mechanism is made up of several parts. First, a cam which transmits
motion to a sector gear [F]; then another cam [E] that is part of the sector
gear. A lever [D] is rotated by this cam through the lever’s bearing. There are
two rollers called the second feed rollers: the upper one [B] and the lower one
[G]. The lever turns a shaft [C] and this shaft moves the upper roller.
At the beginning of each cycle the two rollers are apart, they will come
together halfway through the cycle and at the end of the cycle they will again
be apart.
At first, the rollers are apart, and the sector gear is ready to start moving
clockwise. The lever’s bearing is in contact with the sector gear’s cam. As the
gear turns clockwise, it causes the cam to turn the lever in the same direction
(clockwise).
The lever then lowers the upper roller [B]. It does this by turning the roller’s
eccentric shaft [C]. Eccentric means that the shaft does not go through the
center of the roller, but actually is a little off center. So when the shaft turns
the roller, the roller moves up or down.
[B]
[G]
[F]
[A]
[D]
[A]
[E]
[C]
1 December 1993
2-49
Summary of Contents for VT3500
Page 8: ...2 6 USER CODE MODE 4 27 2 6 1 User Codes 4 27 2 6 2 How To Use a User Code 4 27...
Page 15: ...SECTION 1 OVERALL MACHINE INFORMATION...
Page 19: ...2 GUIDETOCOMPONENTSANDTHEIRFUNCTION 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1 December 1993 1 5...
Page 21: ...16 17 18 19 20 21 22 23 24 25 26 27 28 1 December 1993 1 7...
Page 37: ...SECTION 2 SECTIONAL DESCRIPTION...
Page 89: ...E H D G F D C A B C I J K 1 December 1993 2 53...
Page 123: ...1 December 1993 2 87...
Page 127: ...1 December 1993 2 91...
Page 162: ...13 14 15 16 17 18 10 11 12 1 December 1993 2 126...
Page 163: ...19 20 21 22 23 24 25 26 27 1 December 1993 2 127...
Page 164: ...28 29 30 31 32 33 34 35 36 1 December 1993 2 128...
Page 165: ...37 38 39 40 1 December 1993 2 129...
Page 192: ...SECTION 3 INSTALLATION...
Page 206: ...SECTION 4 SERVICE TABLES...
Page 209: ...Q Fig 4 R S Fig 5 T U Fig 6 V Fig 7 1 December 1993 4 3...
Page 234: ...SECTION 5 REPLACEMENT AND ADJUSTMENT...
Page 317: ...SECTION 6 TROUBLESHOOTING...