J. Sheet Feeder _________________________________________________
EM
3.6km
7.2km
10.8km 14.4km
18km
Notes
(6k)
(12k)
(18k)
(24k)
(30k)
( ) A1 sideways/
D size
1. Feed roller
C
C
C
C
C
C
Water
Replace at 40 K
(A1 sideways/
D size).
2. Friction pad
C
C
C
C
R
C
Water
3. Bottom plate
pad
Replace at 40 K
(A1 sideways/
D size).
4. Relay rollers
C
C
C
C
C
Water
5. Paper feed
guide plate
Clean with a
damp cloth if
necessary.
6. Spring clutch
L
Mobil Temp. 78
7. Teflon tape
(2 tapes)
R
K. Roll Feeder __________________________________________________
EM
3.6km
7.2km
10.8km 14.4km
18km
Notes
(6k)
(12k)
(18k)
(24k)
(30k)
( ) A1 sideways/
D size
1. Feed Roller
C
C
C
C
C
C
Water
2. Exit Roller
C
C
C
C
C
C
Water
L. Roll Feeder Connector _________________________________________
EM
3.6km
7.2km
10.8km 14.4km
18km
Notes
(6k)
(12k)
(18k)
(24k)
(30k)
( ) A1 sideways/
D size
1. Relay Rollers
C
C
C
C
C
2. Spring Clutch
L
Mobil Temp. 78
31 December 1992
PREVENTIVE MAINTENANCE SCHEDULE
4-5
Summary of Contents for FW830
Page 3: ...SECTION 1 OVERALL MACHINE INFORMATION...
Page 19: ...SECTION 2 DETAILED SECTION DESCRIPTIONS...
Page 68: ...SECTION 3 INSTALLATION...
Page 86: ...SECTION 4 SERVICE TABLES...
Page 140: ...SECTION 5 REPLACEMENT AND ADJUSTMENT...
Page 209: ...SECTION 6 TROUBLESHOOTING...
Page 223: ...74 72 73 76 75 79 85 84 83 82 80 81 86 87 88 77 78...
Page 224: ...90 89...