19. Connect the operation unit [A] to the operation unit stand [B] (4 screws
and 2 connectors).
20. Install the operation unit (1 M5 x 8 screw [C] and 1 connector [D]) and the
operation unit stopper [E] (2 M5 x 8 screws). The oval hole [F] of the
operation unit stopper should be at the lower position.
NOTE:
•
2 height positions of the operation unit can be selected by the
positions of securing screw [C].
•
The operation unit can be moved left to right by removing one
M5 x 8 screw [C] when the operation unit is mounted at the
lower position.
21. Secure the grounding wire [G] of the operation unit (1 screw) and reinstall
the right rear cover.
22. Install the drum guide bracket [H] (1 screw) and set the drum guide [I] to
the lower inner cover.
[B]
[A]
A171I513.img
[C]
[D]
[G]
[E]
[F]
A171D528.img
[H]
[I]
A171I506.img
INSTALLATION PROCEDURE (COPIER)
31 July 1995
3-10
Summary of Contents for FT8680
Page 3: ...SECTION 1 OVERALL MACHINE INFORMATION ...
Page 8: ...MEMO 31 July 1995 SPECIFICATIONS 1 5 ...
Page 23: ...6 5 IMAGE OVERLAY MODE 2ND SIDE A171V505 wmf PAPER PATH 31 July 1995 1 20 ...
Page 24: ...SECTION 2 DETAILED SECTION DESCRIPTIONS ...
Page 133: ...Timing Chart 1 Stack 2 Paper Feed A171D551 wmf A171D552 wmf 31 July 1995 DUPLEX 2 109 ...
Page 159: ...SECTION 3 INSTALLATION ...
Page 177: ...SECTION 4 SERVICE TABLES ...
Page 229: ...SECTION 5 REPLACEMENT AND ADJUSTMENT ...
Page 362: ...SECTION 6 TROUBLESHOOTING ...