
UM-B-041
SmartBond Production Line Tool
User Manual
Revision 4.8
02-Nov-2022
CFR0012
93 of 170
© 2022 Renesas Electronics
Click
Yes
to start the testing procedure. PLT updates the status of the procedure for each DUT and
the Golden Unit (
). The
START
button is replaced by a progress bar indicating the progress
of the tests.
Figure 77: GUI PLT Testing (1 of 2)
If an error in a DUT is found (
), PLT will show the status code, a brief description of the
error and the color of the DUT
’s status line will turn red. The DUT number button can be pressed
anytime to access the DUT Log File (Section
)to get more details about the parameters used,
calculated values and the reason for failure in the case of an error.