UM-B-041
SmartBond Production Line Tool
User Manual
Revision 4.8
02-Nov-2022
CFR0012
35 of 170
© 2022 Renesas Electronics
Ste
p
Description
6
Connect the PLT HW to the PC. Connect the GU and the DUT USB cables to the PC. Check the
Windows Device Manager that 17 new COM ports were found, 16 for the DUTs and 1 for the GU. The
following screenshot is an example of a Device Manager COM ports for a PC that has the PLT
connected.
7
On the
SmartBond_PLT_CFG.exe
Hardware Setup initial screen click
Auto
to automatically find the GU
COM port among the 17 Windows enumerated COM ports. The
Auto
button will turn green if
successful. Press
Save*
to save the new GU COM port in the
params.xml
file.
Table 11: SmartBond_PLT_GUI.exe Application Execution
Step
Description
1
To successfully start the
SmartBond_PLT_GUI.exe
application, the
SmartBond_PLT_CFG.exe
should be
executed first in order to set up the system and perform the required tests. See
2
Go to folder '
executables
'. This folder should contain the following files and sub-folders.
Double click on
SmartBond_PLT_GUI.exe
.