12
|
Regency Horizon® HZ40E-10 Gas Fireplace
|
12
installation
UNIT ASSEMBLY PRIOR TO
INSTALLATION
The nailing Strips must be correctly positioned and attached before unit is
slid into position.
NAILING STRIPS
The nailing strips come attached to the unit. There is 1 plate on each side.
The side nailing strips are secured to the framing.
IMPORTANT NOTE
Framing depth measurement is noted with the nailing strips
set as far forward on the irebox as possible. The nailing
strips can be adjusted back up to 3-1/4” to allow for varying
thicknesses in non-combustible material & wall inishes.
Nailing Strips
INSTALLATION ACCESS PANEL
The unit is equipped with a removable access panel for pre-inish installation
of optional components - this panel is located on the lower front face.
1.
Remove 8 screws to remove access panel.
2.
Easier access to gas connection with panel removed.
3.
Install any optional components with access panel removed.
4.
Reinstall access panel with 8 screws - prior to installing any facing material
Note:
Access panel is no longer accessible once facing material installed.
Installation Access Panel