Refraction Technology
Refraction Technology, Inc.
63
4
Periodic Maintenance Operations
4.1
Introduction
This section provides maintenance information for the 130-01/3 and 130-
01/6 on the following topics:
Replacing the Compact Flash
Connector Assembly & Maintenance
Periodic Maintenance checks
Replace CPU Battery (130-01/3 and 130-01/6)
Disassembly of the 130 for service
Sealing and pressure testing a 130-01 DAS
Adding or replacing an RT527
Testing the 130 DAS Memory
This section provides maintenance procedures that increase the
effectiveness and useful life of your recorder unit(s).
WARNING: All REF TEK circuit boards are Static Sensitive and appropriate handling
is required to protect each board from damage due to Static discharge.
1. Please insure that when handling REF TEK circuit boards, the handler and the work
bench are grounded. This is usually done via a grounding mat on the bench, which is
ultimately grounded to the building ground and also attached to the handler.
2. When shipping individual boards they must be wrapped in anti-static protection,
either anti-static bags or boxes. REK TEK can supply these if requested.
3. Failure to protect against static increases the chance of boards being damaged and
may void REF TEK warrantee.
Summary of Contents for 130-01
Page 16: ...130 01 Operations Refraction Technology Inc 2 ...
Page 54: ......
Page 82: ...130 01 Operations Refraction Technology Inc 68 Figure 51 PTO Connector ...
Page 87: ...Doc 1301 Ops Rev 2 9 1 10 30 08 Refraction Technology Inc 73 ...
Page 88: ...130 01 Operations Refraction Technology Inc 74 ...
Page 89: ...Doc 1301 Ops Rev 2 9 1 10 30 08 Refraction Technology Inc 75 ...
Page 96: ......