Version 3.03
WR14 / WR50-12/13 Winding Resistance Meter Instruction Manual
28
This shows a transformer profile which was created and measured for the first time on June 1st 2010.
Then this transformer was measured again on the 1st of each month. This means that the transformer
Profile was loaded from the archive each time a measurement was required and done.
In the example above, it is the 1st of September. The transformer Profile is loaded (made active) and a
measurement is done. The new measurement data was saved and stored (linked) with the transformer
Profile. Thus creating a history for this particular transformer.
Transformer Profile
(Header)
Measurement 1
(1 June 2010)
Measurement 2
(1 July 2010)
Measurement 3
(1 Aug 2010)
Measurement 4
(1 Sept 2010)
Do
Measurement
Save it
Measurement 4
(1 Sept 2010)