Supplied By www.heating spares.co Tel. 0161 620 6677
Model
Model no
of fl ue
extensions
Overall
max fl ue
length
Distance to
centre of fl ue
from back wall
HE PRIMARY
3
4 metre
200 mm
24
Cut a 105 mm diameter hole through the ceiling and/
or roof, at the point previously marked.
Fit a roof fl ashing sleeve (Fig. 43) to the roof, available
from Ravenheat Manufacturing.
Insert the Vertical Flue terminal assembly through the
fl ashing plate from the outside.
Fix the appliance to the wall, locating onto the top
coach bolts Fit the two lower coach bolts and tighten
all four securing bolts.
Measure the vertical distance between the top of the
fl ue (Fig.42) and the bottom of the fl ue
terminal assembly (Fig.41).
The measurements should be taken from the outer
diameter of the fl ue.
NOTE:
Where this length does not match any stan-
dard combination of the extensions, extension can be
cut to the required length (Fig.44).
When cutting both inner and outer ducts of the extension,
always cut on spigot side, and they must be de-burred
Starting at the appliance end, assemble the extension
duct sections, making each inner and outer (fl ue) joint
by inserting the spigot end into the socket end of the next
tube, making sure the seal rings are correctly located (Fig
44). Make sure that the entire fl ue is adequately suppor-
ted. Use at least one bracket for each extension used.
Ensure that all inner fl ue connections have a good fi t/
seal, and that the space clips in each extension are
correctly positioned.
5.8
REASSEMBLE BOILER AS PER
(sect. 5.6.1)
5.8.1
Fitting valve pack
Remove plastic caps from boiler connection
and
fi t fl anged copper tail and valves as per
using washers provided.
5.9 GAS
CONNECTION
5.9.1
A minimum working gas pressure of 20 mbar
must be available at the boiler inlet
at
full
fl ow rate (37 mbar for propane, 29
mbar for butane).
5.9.2
Fit gas service cock to the boiler via the union
nut and connect gas pipe.
Do not overtighten and use another spanner
as a counter force to avoid straining internal
connections.
Important consult (sect 4.5.1).
5.10
CENTRAL HEATING CONNECTION
5.10.1
Before any central heating connections are
made to the boiler all system valves should
be opened and the system thoroughly fl shed
out with cold water.
- Connect the central heating return pipe
marked
C.H.R
- Connect the central heating fl ow pipe
marked
C.H.F
- Pipe dimensions and positions are marked
on template supplied.
Fig 44
FLUE EXTENSION
CUT
Summary of Contents for HE Primary AAA
Page 16: ...Supplied By www heating spares co Tel 0161 620 6677 17 Fig 18...
Page 31: ...Supplied By www heating spares co Tel 0161 620 6677 Fig 58 32 Fig 56 Fig 57...
Page 33: ...Supplied By www heating spares co Tel 0161 620 6677 34 Fig 60 Fig 61 Fig 62 Fig 63...
Page 42: ...Supplied By www heating spares co Tel 0161 620 6677 section 10 EXPLODED PARTS DIAGRAM 43...