Supplied By www.heating spares.co Tel. 0161 620 6677
Fig. 12
Fig. 13
Fig. 14
16
OPTIONAL EXTRAS:
STRAIGHT HEADER Box containing (Fig 13) :
57 - Straight header
59 - Rubber seal Ø 60
66 - Flue gas sample point
FLUE EXTENSION Box containing(Fig 14)
1000 mm fl ue extension duct as an extra cost only when
requested for side and vertical fl ue applications
59 - Rubber seal Ø 60
63 - Air intake duct extension
64 - Flue exhaust duct extension
65 - Pipe centering spring
5.2 DELIVERY
5.2.1
The appliance carton containing (Fig.15)
a) boiler fully assembled
b) installation instructions and
user
instructions
c) white paper template
d) terminal cover plate
Polythene bag containing
a) 1-1/2” BSP Union Gas Cock
b) 2-22 mm fl anged copper tails complete
with 3/4” brass nuts and washers
c) 4 coach bolts and wall plugs
screws and dowels.
WARNING
Maximum allowable fl ue length 2.5 m
maximum No 2x1000 mm
Flue duct extension used with standard fl ue
Horizontal HE fl ue kit carton
containing (Optional) (Fig 12)
57- Flue bend assembly
58- Header gasket
59- Rubber seal Ø 60
60- Air intake duct
61- Flue exhaust duct
62- Terminal
65- Pipe centering spring
66- Flue gas sample point
127-Terminal Cover Plate
Summary of Contents for HE Primary AAA
Page 16: ...Supplied By www heating spares co Tel 0161 620 6677 17 Fig 18...
Page 31: ...Supplied By www heating spares co Tel 0161 620 6677 Fig 58 32 Fig 56 Fig 57...
Page 33: ...Supplied By www heating spares co Tel 0161 620 6677 34 Fig 60 Fig 61 Fig 62 Fig 63...
Page 42: ...Supplied By www heating spares co Tel 0161 620 6677 section 10 EXPLODED PARTS DIAGRAM 43...