Installation: Installation
35
INSTALLATION
FIGURE 46. Dual Pump Fitting Assembly
2. Assemble the check valve fittings to the rinse valve. Ensure the flow direction arrow on the check valves points
towards the rinse valves.
1” Hose
Barb to
M100
3/4” Hose
Barb to
M100
M100 Gasket
M100
Clamp
M100 to 1/2”
NPT
3/4”
Check
Valve
12/” NPT Check
Valve
1/2” NPT
Street
Elbow
1/2”
Rinse
Selector
Valve
1/2” NPT
Strainer
1/2” NPT
Plug
1/2”
Drain
Valve
1/2” NPT
Pipe Nipple
1/2” FNPT to M100
Connect to Pump Inlet
Flow
Direction
1/2” NPT
Pipe Nipple
Summary of Contents for Sidekick Pro
Page 12: ...CHAPTER 2 10 CAN Sidekick Pro Injection for Case IH 3 4XXX Installation and Operation Manual ...
Page 84: ...CHAPTER 7 82 CAN Sidekick Pro Injection for Case IH 3 4XXX Installation and Operation Manual ...
Page 88: ...CHAPTER 8 86 CAN Sidekick Pro Injection for Case IH 3 4XXX Installation and Operation Manual ...
Page 91: ...System Diagrams Electrical 89 SYSTEM DIAGRAMS FIGURE 2 Single Pump System Diagram ...
Page 93: ...System Diagrams Electrical 91 SYSTEM DIAGRAMS PLUMBING FIGURE 4 Dual Pump Injection Plumbing ...
Page 96: ...Index 94 CAN Sidekick Pro Injection for Case IH 3 4XXX Installation and Operation Manual ...