![Raven Sidekick Pro Installation And Operation Manual Download Page 29](http://html.mh-extra.com/html/raven/sidekick-pro/sidekick-pro_installation-and-operation-manual_788997029.webp)
Installation: Installation
27
INSTALLATION
FIGURE 32. Stiffener Rod Installed
SAFETY DECAL PLATE AND REFLECTOR INSTALLATION
1. Secure the safety decal plate to the lower support using 5/8” - 11 x 2” bolts, 5/8” washers (two per bolt), and 5/
8” Nyloc nuts.
FIGURE 33. Safety Decal Plate Installed
2. Install the reflector decals on the safety decal plates. Place the orange decal above the red decal on each side
of the machine.
3. Tighten all previously installed 5/8” nyloc nuts to 150 ft-lbs.
Stiffener Rod
(107-0172-378)
Install Both Stiffener
Rods so Support Arm
is Closer to Inside of
Machine
Safety Decal Plate
Summary of Contents for Sidekick Pro
Page 12: ...CHAPTER 2 10 CAN Sidekick Pro Injection for Case IH 3 4XXX Installation and Operation Manual ...
Page 84: ...CHAPTER 7 82 CAN Sidekick Pro Injection for Case IH 3 4XXX Installation and Operation Manual ...
Page 88: ...CHAPTER 8 86 CAN Sidekick Pro Injection for Case IH 3 4XXX Installation and Operation Manual ...
Page 91: ...System Diagrams Electrical 89 SYSTEM DIAGRAMS FIGURE 2 Single Pump System Diagram ...
Page 93: ...System Diagrams Electrical 91 SYSTEM DIAGRAMS PLUMBING FIGURE 4 Dual Pump Injection Plumbing ...
Page 96: ...Index 94 CAN Sidekick Pro Injection for Case IH 3 4XXX Installation and Operation Manual ...