1. Secure the left and right tank cage to the upper tank support using the provided 1/2” washers, 1/2” - 13 x 1-3/4”
bolts, and 1/2” nyloc nuts. Tighten all nuts to 75 ft-lbs.
FIGURE 35. Tank and Tank Cage
2. Install the tank so that the tank lid faces towards the front of the machine.
MIXER INSTALLATION
MIXER INSTALLATION
1. Install the mixer to the upper center boom section of the machine with the supplied 3/8” - 16 x 2-1/2” (for 120’)
or 1-5/16” u-bolts (for 90’ - 100’), 3/8” washers, 3/8” spacers (for 120’), and 3/8” nyloc nuts.
NOTE:
Place the mixer so that the inlet check valve is on the right side of the machine with the center of the
mixer approximately 4” right of the center boom.
Orange
Red
Lid
(118-0159-043)
Tank
(118-0159-059)
Tank Cage
(116-0159-759)
1/2”
Hardware
Summary of Contents for Sidekick Pro
Page 12: ...CHAPTER 2 10 CAN Sidekick Pro Injection for Case IH 3 4XXX Installation and Operation Manual ...
Page 84: ...CHAPTER 7 82 CAN Sidekick Pro Injection for Case IH 3 4XXX Installation and Operation Manual ...
Page 88: ...CHAPTER 8 86 CAN Sidekick Pro Injection for Case IH 3 4XXX Installation and Operation Manual ...
Page 91: ...System Diagrams Electrical 89 SYSTEM DIAGRAMS FIGURE 2 Single Pump System Diagram ...
Page 93: ...System Diagrams Electrical 91 SYSTEM DIAGRAMS PLUMBING FIGURE 4 Dual Pump Injection Plumbing ...
Page 96: ...Index 94 CAN Sidekick Pro Injection for Case IH 3 4XXX Installation and Operation Manual ...