C
HAPTER
3
46
CAN Sidekick Pro Injection for Case IH 3/4XXX Installation and Operation Manual
5. Route the tank hose to the middle 1” hose barb elbow fitting on the rear fill valve station for Tank 1 (left side of
machine).
NOTE:
It may be necessary to install provided M100 coupler to adjust the position of the rear fill station tank
connection port.
6. Cut the hose to length that prevents kinking or other damage.
7. Secure the hose to the fill station barb with two of the provided hose clamps.
8. Attach the provided rubber hose guards and cable ties to protect the hose from sharp edges.
9. Repeat step 1 to step 8 for Tank 2 to fill station hose routing.
FIGURE 67. Tank 2 Hose Routing to Fill Station Valve
TANK OVERFLOW HOSES
1. Connect one end of the supplied 1” braided hose to the hose barb fitting on the tank overflow plumbing at the
top of the tank.
Route Hose Along
Existing Machine
Plumbing
Tank 2
Route Hose
Around Front of
Engine
Compartment to
the Middle Port
on the Front Fill
Station Valve
Summary of Contents for Sidekick Pro
Page 12: ...CHAPTER 2 10 CAN Sidekick Pro Injection for Case IH 3 4XXX Installation and Operation Manual ...
Page 84: ...CHAPTER 7 82 CAN Sidekick Pro Injection for Case IH 3 4XXX Installation and Operation Manual ...
Page 88: ...CHAPTER 8 86 CAN Sidekick Pro Injection for Case IH 3 4XXX Installation and Operation Manual ...
Page 91: ...System Diagrams Electrical 89 SYSTEM DIAGRAMS FIGURE 2 Single Pump System Diagram ...
Page 93: ...System Diagrams Electrical 91 SYSTEM DIAGRAMS PLUMBING FIGURE 4 Dual Pump Injection Plumbing ...
Page 96: ...Index 94 CAN Sidekick Pro Injection for Case IH 3 4XXX Installation and Operation Manual ...