C
HAPTER
3
30
CAN Sidekick Pro Injection for Case IH 3/4XXX Installation and Operation Manual
FIGURE 37. 3XXX Supply Hose Cutting
2. Install the hose barb flanged fittings into the open ends of the cut hoses. Both 1-1/2” and 2” have been
provided to accommodate different plumbing sizes.
NOTE:
It may be necessary to lubricate the hose barb fitting to install the hose.
3. Assemble the mixer inlet and outlet plumbing as shown below using the fittings, clamps, and gaskets provided.
FIGURE 38. Mixer Inlet Plumbing Installed
Measure and Cut
Supply Hose
Approximately 36”
From This End
Hose From Front of
Machine
M300 to M220
Reducer Coupling
M300 45° Fitting
M300 Sweep Elbow
with 1/4” Gauge Port
(Should Face Away
from Boom)
1-1/2” to 3”
Hose Clamp
M220 Clamp (1)
and M220
Gasket (1)
M300 Clamp (3)
and M300
Gasket (3)
Installed Mixer and
Check Valve
Assembly
1-1/2” Hose Barb to
M220 (1) or 2” Hose
Barb to M220 (1)
1/4” Port Plug
Summary of Contents for Sidekick Pro
Page 12: ...CHAPTER 2 10 CAN Sidekick Pro Injection for Case IH 3 4XXX Installation and Operation Manual ...
Page 84: ...CHAPTER 7 82 CAN Sidekick Pro Injection for Case IH 3 4XXX Installation and Operation Manual ...
Page 88: ...CHAPTER 8 86 CAN Sidekick Pro Injection for Case IH 3 4XXX Installation and Operation Manual ...
Page 91: ...System Diagrams Electrical 89 SYSTEM DIAGRAMS FIGURE 2 Single Pump System Diagram ...
Page 93: ...System Diagrams Electrical 91 SYSTEM DIAGRAMS PLUMBING FIGURE 4 Dual Pump Injection Plumbing ...
Page 96: ...Index 94 CAN Sidekick Pro Injection for Case IH 3 4XXX Installation and Operation Manual ...