96/118
This document and the information contained herein, is the exclusive property of R&M Materials Handling Inc. and represents a non-public, confidential and proprietary trade
secret that may not be reproduced, disclosed to third parties, altered or otherwise employed in any manner whatsoever without the express written consent of R&M Materials
Handling Inc. Copyright 2020 © R&M Materials Handling Inc. All rights reserved.
4
Chain
• Lubricate the chain carefully before the first run (commissioning).
• To lubricate the chain, apply a substantial amount of lubricant over the full length of
the chain. Make sure that the chain is lubricated all over its surface and links,
especially on all contact areas between the chain links.
• To extend chain lifetime, continue to lubricate the chain within regular intervals.
• The lubrication interval varies from a minimum of one week to one year, depending on
the use of the hoist.
• If the chain is dry, clean it before lubrication to avoid dust accumulation and damaging
the sprockets and chain guides.
• Standard: Grease lubricant.
Installation
Trade name and number
Quantity
Lubricate before 1
st
run
Renolit LZR 000
As required
• Available as an option: Oil lubricant.
Installation
Trade name and number
Quantity
Lubricate before 1
st
run
MOBILGEAR 600 XP 220
As required
• Available as an option: Food safety lubricant (oil).
Installation
Trade name and number
Quantity
Lubricate before 1
st
run
Exalub AL 46
As required
Return sprocket axle (2-fall hoists only)
• Standard: Grease lubricant.
Installation
Trade name and number
Quantity
Annually or every
400 hours
Grease* KP 2** soap-based lithium
(e.g. Fuchs Renolit Duraplex EP 2)
As required
• drip point: +260°C (500°F)
• worked penetration:
+265°C (509°F)
…295°C (563°F)
• operating temperature:
-20°C (-4°F)...+130°C (266°F)
*(without MoS2).
**(DIN 51 502).
CAUTION
When driving the load hook up, watch out for moving components, such as the
chain and the load hook.