19/118
This document and the information contained herein, is the exclusive property of R&M Materials Handling Inc. and represents a non-public, confidential and proprietary trade
secret that may not be reproduced, disclosed to third parties, altered or otherwise employed in any manner whatsoever without the express written consent of R&M Materials
Handling Inc. Copyright 2020 © R&M Materials Handling Inc. All rights reserved.
8
Ensure that the support structure is prepared for the product
Owners must ensure that the support structure which the product is attached to is
designed for the load of the product and meets the specific requirements and
tolerances.
9
Check the power supply is compatible
Check that the supply voltage and frequency match the requirements of the product.
Check that the installed bus bars are suitable for the product.
10
Safety devices must be restored to operational status
Ensure that any safety devices which have been bypassed for testing purposes have
been restored to full operational status before allowing the product to be used for
normal operation.
11
Check the environmental and space requirements
Ensure that the operating environment and space reserved for the product in the
operating location is suitable for all functions of the product.
12
Check for dimensional conformance
Before installation and prior to commissioning, check that the supplied parts conform to
the drawings, instructions, parts lists, and structural measurements. Discuss any non-
conformance with the supplier immediately.
13
Ensure that there are no hazards from loose items
Items which are not properly secured to the product, such as tools or detached
components, could move or fall accidentally, with potentially serious consequences.
When dismantling the product, lower components to the ground at the earliest practical
opportunity.
14
Ensure that there are no electrical hazards
Check for any electrical hazards in and around the working area and take appropriate
steps to minimize them. Only properly trained personnel may perform electrical work
on the product and they must use safe methods at all times.
15
Take precautions if welding is done at the site
If there is a need for welding to be done at the site:
Provide suitable fire extinguishers.
Do not allow the product structure or any of the components to be used for grounding.
The hook must be isolated before any welding can be performed on it.