45/118
This document and the information contained herein, is the exclusive property of R&M Materials Handling Inc. and represents a non-public, confidential and proprietary trade
secret that may not be reproduced, disclosed to third parties, altered or otherwise employed in any manner whatsoever without the express written consent of R&M Materials
Handling Inc. Copyright 2020 © R&M Materials Handling Inc. All rights reserved.
6
COMMISSIONING
Note:
Before handing over the equipment, proper commissioning shall be done. The required inspections and
adjustments are listed in the chapters concerning the installation and commissioning of the hoist.
The equipment shall not be used before proper commissioning.
The commissioning procedure requires special skills and tools to ensure safe
and reliable operation of the equipment. Commissioning shall be carried out
only by authorized service personnel or an experienced service technician
authorized by the manufacturer or manufacturer’s representative.
Before commissioning, read the instructions in chapter Safety first.
CAUTION
Any defects or abnormalities which are detected during commissioning must
be investigated and corrected in accordance with the instructions relevant to
component in question.
NOTICE
Local requirements may demand other commissioning testing to be performed before
the equipment can be taken into use. Make sure all of the local requirements are
fulfilled.