![R&M LK10C022200 Owner'S Manual Download Page 43](http://html1.mh-extra.com/html/randm/lk10c022200/lk10c022200_owners-manual_774855043.webp)
43/118
This document and the information contained herein, is the exclusive property of R&M Materials Handling Inc. and represents a non-public, confidential and proprietary trade
secret that may not be reproduced, disclosed to third parties, altered or otherwise employed in any manner whatsoever without the express written consent of R&M Materials
Handling Inc. Copyright 2020 © R&M Materials Handling Inc. All rights reserved.
5.2.2
Adjusting pendant cable length
1
2
Cut the wires of socket so that you have a model on how
wires are connected to the socket.
Open the cable gland and peel the wires off from the
length needed.
3
4
Cut the cable to selected length and peel the wires.
Tighten the cable gland (1) and shorten the retaining wire
(2). Make sure that the retaining wire is shorter than the
cable (3), so that the cable itself will not be disconnected
accidentally.
5
Connect the wires to the socket.
Carry out the following procedures before connecting the hoist to the main network:
1
Check that the rated voltages correspond to the main voltage. Voltages and frequencies marked on the data plate of the motors that
are driven by a frequency converter, can deviate from the values on the data plate of the hoist.
2
Check that the power supply to the hoist is protected with fuses of the correct size.