![RAIS Visio 100 RD Installation Manual Download Page 47](http://html1.mh-extra.com/html/rais/visio-100-rd/visio-100-rd_installation-manual_3556300047.webp)
47
GB
INSTALLATION
INSTALLATION
CO measurements are done when the fireplace has been running at full load for 45 minutes, The value must not
exceed the level of national requirements. Wait 25 minutes between the measurements below.
CO levels must not exceed 1000 ppm. O
2
measurement in the outer pipe has to be minimum 19%.
CO measurement on maximum load
1. Put the fireplace in maximum load by pressing twice quickly on the remote control.
CO measurement on minimum load
1. Push the until the secondary burners are shut off.
2. Put the fireplace in minimum load by pressing twice quickly on the remote control.
There are two points. The point at the rear/right end “IN” is for O
2
and the “FLUE OUT” is for CO measurements.
CO
O
2
CO AND O
2
MEASUREMENT
Our fireplaces are fitted with measuring points at the top
of the glass. This gives easy access to measurements.
You will find the points here:
A-A
A
A
RAIS Visio Gas 43-49-65 RD-6543
Visio6_Room_Divider_061022
643,5
798
631
376,9
73
6,
8
78
5,
8
446
643,5
n
13
1
n
199
27
1
27
1
189
807
693
49
0
522
542
A-A
A
A
RAIS Visio Gas 43-49-65 T-6543
Visio6_Tunnel_041022
653
49
0
812
631
377
73
7
78
6
n
131
n
199
27
1
27
1
189
667
542
Room Divider
Tunnel