Page
22
OPTION
SOLAR PANEL
Refer to FIGURE 10 below:
Model Numbers shall be as; PRO-SH-SP
or PRO-PH-SP. (SP designating the
Solar Panel Option).
An option is for use of a Solar Panel, for
the power supply, rather than the
standard 120VAC/16VAC transformer.
Mount the solar panel to the weather
station tower using the mounting
brackets furnished as part of the solar
panel assembly. Mount the solar panel
to the tower so it faces south (northern
hemisphere). Position the solar panel as
high off the ground as practical,
ensuring it cannot interfere with air flow
or sunlight around the sensors.
The solar panel should be oriented to
receive maximum sun light exposure
over the course of the year. It is also
necessary that the solar panel have the
proper “tilt”. Suggested “tilt” angles
(reference to the horizontal plane) are
listed below.
Site Latitude
Tilt Angle
0 to 10 degrees
10 degrees
11 to 20 deg.
La5
degrees
21 to 45 deg.
La10
degrees
46 to 65 deg.
La15
degrees
65 deg.
80 degrees
After determining the “tilt” angle,
loosen the two (2) bolts that attach the
solar panel to the mounting bracket.
Adjust the angle of the solar panel, then
tighten the bolts to secure it in the proper
position. Secure the lead wire, coming
from the solar panel, to the Tower mast
using wire ties.
The solar panel cable shall be routed up
and through the Heyco fitting on the
back panel of the Enclosure and marked
“power”. Unscrew the cap of the Heyco
fitting (on the back side of the enclosure)
and push the plug out of the fitting.
This plug can be discarded as it will not
be used. Now feed the solar panel
power cable through the Heyco fitting
and connect it to the connectors of the
Enclosure, marked “CHG”. The wires
can be attached to these connectors by
“depressing” the lever on the connector
for each wire and while doing so, insert
the stripped end of the wire. Upon
release of the lever,, the wire will be
secured in the connector. CAUTION !
Be careful in depressing the lever so as
not to break the lever. The polarity of
the wires does not matter, therefore it
makes no difference which wire goes
into which connector. The solar panel
installation should now be completed.
Summary of Contents for WS-PRO
Page 2: ......
Page 10: ...Page viii...
Page 16: ...Page 6 FIGURE 2 MAGNETIC DECLINATION FOR THE CONTIGUOUS UNITED STATE...
Page 21: ...Page 11 FIGURE 4 CONCRETE BASE DETAIL FIGURE 5 ANCHOR BOLT TEMPLATE DETAIL...
Page 24: ...Page 14 FIGURE 6 EXTERNAL WIRING DETAIL AT THE PRO SH WEATHER STATION...
Page 27: ...Page 17 FIGURE 7 EXTERNAL WIRING DETAIL AT THE PRO PH WEATHER STATION...
Page 33: ...Page 23 FIGURE 10 SOLAR PANEL INSTALLATION DETAIL...
Page 35: ...Page 25 FIGURE 11 CROSS ARM MOUNTING INSTALLATION OF 034A WIND SENSOR...
Page 48: ...Page 38 FIGURE 21 INSTALLATION AT CENTRAL COMPUTER FOR DIRECT CONNECTED WEATHER STATION...
Page 50: ...Page 40 FIGURE 22 INSTALLATION AT CENTRAL COMPUTER FOR TELEPHONE CONNECTED WEATHER STATION...
Page 73: ...Page 63 FIGURE 28 TYPICAL 3 ROD GROUNDING GRID DETAIL...
Page 75: ...Page 65 FIGURE 30 TESTING OF SOLAR RADIATION SENSOR...
Page 76: ...Page 66 FIGURE 31 TESTING OF RAIN GAGE...
Page 77: ...Page 67 FIGURE 32 TESTING OF TEMPERATURE RELATIVE HUMIDITY SENSOR...
Page 78: ...Page 68 FIGURE 33 TESTING OF AIR TEMPERATURE PROBE...