Page
18
7.0
INSTRUMENTATION ENCLOSURE INSTALLATION:
GENERAL:
The Model PRO weather station
datalogger, power supply, sensor
connection panel, communications
devices and data retrieval peripherals are
mounted in the ET Enclosure with the
sensors themselves mounted on a cross-
arm, which mounts to the top of the
Enclosure.
MOUNTING
ET ENCLOSURE TO THE
TOWER
enclosure brackets down the tower,
from the top of the tower.
Position the Enclosure so that the top of
the enclosure is even with the top of the
tower and on the north side of the tower
(for northern hemisphere). Tighten the
bolts, on the clamps, to secure the
enclosure to the tower. DO NOT over-
tighten the bolts since doing so may
damage the tower or the enclosure.
Refer to FIGURE 8 below
Mount the Enclosure to the top of
the weather station tower, by sliding the
FIGURE 8 - MOUNTING ENCLOSURE ON TOWER
Summary of Contents for WS-PRO
Page 2: ......
Page 10: ...Page viii...
Page 16: ...Page 6 FIGURE 2 MAGNETIC DECLINATION FOR THE CONTIGUOUS UNITED STATE...
Page 21: ...Page 11 FIGURE 4 CONCRETE BASE DETAIL FIGURE 5 ANCHOR BOLT TEMPLATE DETAIL...
Page 24: ...Page 14 FIGURE 6 EXTERNAL WIRING DETAIL AT THE PRO SH WEATHER STATION...
Page 27: ...Page 17 FIGURE 7 EXTERNAL WIRING DETAIL AT THE PRO PH WEATHER STATION...
Page 33: ...Page 23 FIGURE 10 SOLAR PANEL INSTALLATION DETAIL...
Page 35: ...Page 25 FIGURE 11 CROSS ARM MOUNTING INSTALLATION OF 034A WIND SENSOR...
Page 48: ...Page 38 FIGURE 21 INSTALLATION AT CENTRAL COMPUTER FOR DIRECT CONNECTED WEATHER STATION...
Page 50: ...Page 40 FIGURE 22 INSTALLATION AT CENTRAL COMPUTER FOR TELEPHONE CONNECTED WEATHER STATION...
Page 73: ...Page 63 FIGURE 28 TYPICAL 3 ROD GROUNDING GRID DETAIL...
Page 75: ...Page 65 FIGURE 30 TESTING OF SOLAR RADIATION SENSOR...
Page 76: ...Page 66 FIGURE 31 TESTING OF RAIN GAGE...
Page 77: ...Page 67 FIGURE 32 TESTING OF TEMPERATURE RELATIVE HUMIDITY SENSOR...
Page 78: ...Page 68 FIGURE 33 TESTING OF AIR TEMPERATURE PROBE...