RADWIN
2000
D+
User
Manual
Release
3.6.00
3
‐
4
Additional
Outdoor
Site
Requirements
Chapter
3
•
If
the
site
is
not
suitable,
survey
another
site
3.4.1
Additional
Outdoor
Site
Requirements
The
ambient
outdoor
operating
temperature
should
be
‐
35
to
60
C
(
‐
31
to
140
F).
3.4.2
Additional
Indoor
Site
Requirements
The
following
requirements
guarantee
proper
operation
of
the
system:
•
For
IDU
‐
C
units,
allow
at
least
90
cm
(36
“)
of
front
clearance
for
operating
and
mainte
‐
nance
accessibility.
Allow
at
least
10
cm
(4
“)
clearance
at
the
rear
of
the
unit
for
signal
lines
and
interface
cables
•
The
ambient
operating
temperature
should
be
0
to
50°C
(32
to
122
°F)
at
a
humidity
of
up
to
90%,
non
condensing
3.5
Stage
3:
RF
Survey
The
RF
survey
examines
the
wireless
environment
of
the
installation
site,
to
determine
whether
there
are
available
channels
within
the
radio
operating
frequency
band.
An
RF
survey
is
performed
using
a
spectrum
analyzer.
It
is
advisable
to
familiarize
yourself
with
the
spectrum
analyzer
before
going
out
on
site,
specifically
the
Max
Hold
and
Marker
functions.
You
should
perform
the
RF
survey
at
both
proposed
link
sites.
The
survey
should
be
carried
out
during
a
busy
time
of
day,
to
best
judge
the
worst
‐
case
radio
interference.
Allow
2
‐
4
hours
duration
for
a
good
RF
survey.
3.6
RF
Planning
for
Dense
Installations
and
Collocated
Sites
Interference
may
arise
from
•
Self
interference
from
collocated
RADWIN
radios
•
Other
collocated
radio
devices
installed
on
the
same
site.
To
avoid
or
minimize
interference,
follow
these
recommendations:
•
For
collocated
RADWIN
units,
use
an
HSS
unit
to
synchronize
between
them.
Select
a
different
operating
channels
for
each
collocated
RADWIN
unit.
Note
It
is
possible
to
install
the
link
and
use
the
RADWIN
Manager
to
find
a
clear
channel.
Each
frequency
channel
can
be
evaluated
in
turn.
Achievement
of
a
clear
channel
is
indicated
by
the
marker
in
the
Quality
bar
on
the
Channel
Setting
window
(see
moving
into
the
green
area.
Summary of Contents for RADWIN 2000 D+
Page 1: ...USER MANUAL RADWIN 2000 D POINT TO POINT BROADBAND WIRELESS Release 3 6 00...
Page 9: ...Part 1 Preliminaries Release 3 6 00...
Page 16: ...Part 2 Basic Installation Release 3 6 00...
Page 119: ...Part 3 Site Synchronization Release 3 6 00...
Page 150: ...RADWIN 2000 D User Manual Release 3 6 00 12 7 Configuring the GSU...
Page 151: ...Part 4 Advanced Installation Topics Release 3 6 00...
Page 181: ...Part 5 Field Installation Topics Release 3 6 00...
Page 210: ...Part 6 Product Reference Release 3 6 00...
Page 223: ...Part 7 Regulatory Notices Release 3 6 00...
Page 228: ......