RADWIN
2000
D+
User
Manual
Release
3.6.00
4
‐
12
Hardware
Installation
Workflow
for
a
RADWIN
2000
D+
link
Chapter
4
4.5
Hardware
Installation
Workflow
for
a
RADWIN
2000
D+
link
4.5.1
Installing
a
Link
Site
Survey
The
Site
Survey
is
carried
out
as
described
in
Recall
that
the
Site
Survey
has
three
main
steps:
•
Stage
1:
Preliminary
Survey
•
Stage
2:
Physical
Survey
•
Stage
3:
RF
Survey
Site
preparation
Site
Preparation
includes
‐
•
Obtaining
any
necessary
legal
and
statutory
permits
for
installation
of
radio
equipment
•
Clearing
physical
obstructions
as
far
as
possible
•
Erecting
a
mast
or
tower
if
required.
A
mast
‐
sited
ODU
typically
uses
a
pole
attached
to
the
mast.
•
Installing
a
pole
on
a
building
wall
if
required
•
Constructing
a
weather
‐
proof
cabinet
to
house
a
PoE
device
or
other
IDU
if
it
is
not
to
be
housed
indoors
•
Ensuring
availability
of
power,
typically
standard
local
AC
power
•
Ensuring
that
there
is
a
LAN
cable
in
place
from
the
user’s
switch
to
the
PoE/IDU
loca
‐
tion
Summary of Contents for RADWIN 2000 D+
Page 1: ...USER MANUAL RADWIN 2000 D POINT TO POINT BROADBAND WIRELESS Release 3 6 00...
Page 9: ...Part 1 Preliminaries Release 3 6 00...
Page 16: ...Part 2 Basic Installation Release 3 6 00...
Page 119: ...Part 3 Site Synchronization Release 3 6 00...
Page 150: ...RADWIN 2000 D User Manual Release 3 6 00 12 7 Configuring the GSU...
Page 151: ...Part 4 Advanced Installation Topics Release 3 6 00...
Page 181: ...Part 5 Field Installation Topics Release 3 6 00...
Page 210: ...Part 6 Product Reference Release 3 6 00...
Page 223: ...Part 7 Regulatory Notices Release 3 6 00...
Page 228: ......