RM-111 Operations Manual
Contents
Contents
4
8.0 True Three Phase Standard Testing ................................30
9.0 Testing a Radian Standard (Display Gating) .......................35
10.0 Testing an Electromechanical Standard ...........................40
11.0 Testing an Electronic Standard with Taps (Potential Gating) ..45
12.0 Testing an Electronic Standard (Electronic Gating) .............50
13.0 Testing an Induction or Solid State Meter Via KYZ ..............55
14.0 Testing a Solid State Meter Using Calibration LED Output
or Induction Meter Using an Edge Test ............................62
15.0 True Three Phase Meter Testing Using Customer Load .........69
16.0 Testing the Accuracy of a Test Board
(RM-1P Electronic Light Valve Option) .............................74
17.0 Testing the Accuracy of a Test Board
(Open Collector Option) ..............................................77
18.0 Interfacing a Solid State Meter to a Test Board
(Open Collector Option) ..............................................80
19.0 Interfacing a Solid State Meter to a Test Board
(RM-1P Electronic Light Valve Option) .............................83
20.0 Pulse Constants and Kh values for the RM-111 ..................86
21.0 Calculations ............................................................87
22.0 Testing Accessories ..................................................89
23.0 Warranty Service ......................................................96