4-8
Operation
6-00054-02 Rev A
Step 3
Set the Main Circuit Breaker switch on each EM to
ON.
Step 4
Set the Main Circuit Breaker switch on the CM to
ON.
Movements of mechanical components in the Scalar 1000
can cause serious injury. Before turning the Main Circuit
Breaker switch ON, confirm that no danger exists to
personnel or property.
Look into the aisle before you apply library power to make
sure there are no obstructions or personnel present.
Mechanical movement within the library can cause serious
injury.
Power is applied to the Scalar 1000. The CM embedded
software starts the boot process. The Power On indicator
illuminates and the Initial Screen displays status.
The firmware initiates a self test procedure, performs an
auto-configuration, and inventories the library. When
all firmware procedures are complete the Operator Panel
LCD screen displays the Main Screen. See Figure 4-3.
Figure 4-3
Main Screen
Warning
Warning
MAIN SCREEN
MM/DD/YY
Idle
Online.........Ready
HH/MM/SS
Summary of Contents for Scalar 1000
Page 1: ...Scalar 1000 Library Operator Guide...
Page 10: ...x Contents 6 00054 02 Rev A...
Page 20: ...xx Tables 6 00054 02 Rev A...
Page 22: ...1 2 About this Guide 6 00054 02 Rev A...
Page 32: ...2 2 System Description 6 00054 02 Rev A...
Page 45: ...Connectivity 2 15 22 June 2004 Figure 2 4 Indirect Fibre Channel Attachment...
Page 50: ...3 2 Safety 6 00054 02 Rev A...
Page 56: ...4 2 Operation 6 00054 02 Rev A...
Page 58: ...4 4 Operation 6 00054 02 Rev A Figure 4 1 Operator Panel 4X20 LCD Panel Speaker Vent...
Page 80: ...5 4 Menus and Commands 6 00054 02 Rev A...
Page 83: ...Using the Operator Panel Menu 5 7 22 June 2004 Figure 5 1 Operator Panel Directory Structure...
Page 226: ...6 2 Processing Media 6 00054 02 Rev A...