Q40 Tape Library
Installation and Operations Manual
511026 Rev. 07-01-19
28
b.
Unlock the top cover using two small screwdrivers
.
c.
Lift the front end of the cover and pull gently forward to disengage from the pivot point at the unit
center.
2.
Install top cover on the Expansion Module that will be installed on the top of the library.
a.
Place the Expansion Module on a work table
b.
With the front of the top cover raised, engage the rear of the cover at the Expansion Module pivot
point located at the back of the opening.
c.
Lower the front of the top cover until the latches engage on both sides.