AFV-P Series High Performance Programmable AC Power Supply
9
2
Installation
2.1
Inspection
After unpacking the product, please inspect any damage that may have occurred
during the shipment. Save all packing materials in case the product has to be re-
turned one day.
If any damage is found, please file a claim with the carrier immediately. Do not return
the product to the factory without obtaining the prior Return Merchandise Authori-
zation (RMA) acceptance from Preen.
2.2
User Preparation
Be sure the device is connected to the power line input that meets the specification.
The device must be installed in an air-circulated area, so that the fans built-in are
able to ventilate the heat generated by components properly. The ambient temper-
ature should be controlled within 40
C.