9
9.37
9925724 R01 - 2014-2015
RZR
XP 1000 /
RZR
XP4 1000 Service Manual
© Copyright 2014 Polaris Industries Inc.
3.
Install lower radius rod bolt, washer and new nut.
Torque to specification.
Radius Rod to Bearing Carrier Bolt:
40 ft-lb (54 Nm)
4.
Install the pad adjustment screw and turn until
stationary pad contacts disc, then back off 1/2 turn.
5.
Follow bleeding procedure outlined earlier in this
chapter.
6.
Install wheel and torque wheel nuts to specification.
Wheel Nuts:
120 ft-lbs (163 Nm)
NOTE: If new pads are installed, refer to Brake
Burnishing Procedure, page 9.32.
BRAKE SYSTEM
Summary of Contents for RZR XP 1000
Page 4: ......
Page 6: ......
Page 525: ...2014 RZR XP 1000 Chassis ...
Page 526: ...2014 RZR XP 1000 Chassis ...
Page 527: ...2014 RZR XP4 1000 Chassis ...
Page 528: ...2014 RZR XP 1000 XP4 1000 Box ...
Page 529: ...2014 RZR XP 1000 INT L Chassis ...
Page 530: ...2014 RZR XP 1000 INT L Chassis ...
Page 531: ...2014 RZR XP 1000 INT L Box ...
Page 532: ...2015 RZR XP4 1000 Chassis ...
Page 533: ...2015 RZR XP4 1000 Chassis ...
Page 534: ...2015 RZR XP 1000 Chassis ...
Page 535: ...2015 RZR XP 1000 Chassis ...
Page 536: ...2015 RZR XP 1000 XP4 1000 Box ...
Page 537: ...2015 RZR XP 1000 INT L Chassis ...
Page 538: ...2015 RZR XP 1000 INT L Chassis ...
Page 539: ...2015 RZR XP 1000 INT L Box ...